
Projects with
Synergy Systems:
-
Aquarium of the
Americas
-
Atlantic
City Boardwalk Hall
-
Canadian Forces Base
-
Crazy Horse Saloon
-
First American Financial Corp.
-
Fresno Convention Center
-
Miller Park
-
Saint Vincent Medical City
-
Southtowne Exhibition Center
|
First American Financial
Location:
Santa Ana, CA
Architect: LPA
Contractor: South Coast Electric
Engineer: Konsortum
The First American Financial Corporation, based in Santa Ana,
Calif., is a provider of real estate-related financial and
information services.
|
 |
Standard System Features
The system consists of ten Synergy lighting control panels
distributed between the three floors of the three building
campus-style complex. All are configured with relays and
interconnected on a campus-wide network providing traditional
commercial office lighting control functions as well as California
Title 24 compliance. Synergy Configuration software is installed on
a owner supplied PC for system set-up and monitoring functions.
Designer styled switch stations are strategically placed throughout
the facility for cleaning crew use and after hour override
functions.
Unique System Features
Because this is a three building campus, it is necessary for the
control network to extend underground between buildings. The
designers chose to avoid the dangers of exposing data transmission
cables to environmental conditions outside the buildings by
specifying that inter-building data connections use fiber optic
cable only. The Synergy system uses two pairs of fiber optic modems
to seamlessly extend the RS485 lighting control network between the
buildings.
|
| |
|